Work for the week of July 27 is scheduled as follows:
Hot Mix Asphalt - leveling binder placement
Structure adjustments in roadway pavement
Traffic signal loops at Route 64
Roadway ditch grading north of Voltaire Lane
Crack prevention material placement (Petromat)