You are here

Week of July 27, 2015

West Side of Fox River

Avalon Court
Hot Mix Asphalt, leveling binder and crack prevention material

8th Street and 8th Court
Hot Mix Asphalt, leveling binder and crack prevention material               

Greenwood Ln., Mockingbird Ct. and Oxmoor Ct.
Hot Mix Asphalt, surface and crack prevention material

East Side of Fox River

Walnut Ave.
Concrete street repair and patching

Crabapple Ln.
Hot Mix Asphalt, leveling binder and crack prevention material.

S. 10th Ave
Utility work in street. (Replacement of water main structures)

Stone Dr. and DuKane Dr.
Utility work in street. (Replacement of water main structures)

Tyler Road
No work this week

All residents that are within the affected construction limits have received a master notification letter describing the projects limits, and anticipated work activities. Additional construction notifications may be posted on residential doors prior to work being done.

created Jul 27, 2015 updated Mar 23, 2018