The work proposed for the week of June 27th includes:

  • Resurfacing Area (Division Street to Cambridge Drive)
    • East Side of Street – The curb, sidewalk, driveway and topsoil work will be wrapped up this week.
    • West Side of Street – The curb, sidewalk, driveway and topsoil work will be wrapped up this week.  Residents who will be impacted by driveway removals will receive an orange door tag 24-48 hours before the removals will take place.  Not all driveways will be impacted with this work.
  • Reconstruction Area (Cambridge Drive to Tyler Road)
    • The lowering of the utilities will continue this week.  The contractor will be removing the curb and driveways in this area along with beginning the excavation for the new roadway.
    • During this work the roadway will be closed to traffic between the hours of 7am to 7pm.  If you have a vehicle you would like to use during this time, please make sure to have it out of the project area by 7am.  It is planned to have a stone ramp to all driveways in place at the end of each work day.  If we run into any problems during the excavation work that would prohibit access at the end of the day to your property you will be notified.