The construction work on the Municipal Building is in its final stages. Window replacements on the upper floor of the east elevation of the Old City Hall have been completed and the large “garage door” window is installed. Replacement of the limestone base and stone copings has been completed and a final washing of this elevation is underway.
The roofing contractor has finalized the replacement work on all the roof sections. Only minor finishing touches are left as the interface between the roof and the outward facing elevations are completed.