Project: Emergency Water Shut Down to Replace a Fire Hydrant 

Date & Time: Sept. 25, 2020, 9 a.m. - 2 p.m.

Location: S. 6th & Horne Street. Click here for a map of affected area.

Details:

Water Division will be shutting the water off to replace a fire hydrant. A water boil order will begin when the water service is restored. All water used for consumption must be boiled for at least five minutes prior to use. All effected customers have been notified by door tags. After the water service has been restored the samples will be collected for analysis.

Customers will be under this precautionary boil order for approximately 48 hours. Once the lab has verified clear water samples, the customers will be notified with another door notice.


Project: Emergency Water Shut Down to Repair a Broken Water Main

Date & Time: Sept. 23, 2020, 1 - 5 p.m.

Location: 920 Kehoe Drive. Click here for a map of affected area.

Details:

Water Division will be shutting the water off for a Main Break. A water boil order will begin when the water service is restored. All water used for consumption must be boiled for at least five minutes prior to use. All effected customers have been notified by door tags. After the water service has been restored the samples will be collected for analysis.

Customers will be under this precautionary boil order for approximately 48 hours. Once the lab has verified clear water samples, the customers will be notified with another door notice.


Project: Emergency Water Shut Down to Replace a Fire Hydrant

Date & Time: Sept. 24, 2020, 9 a.m. - 5 p.m.

Location: 920 Kehoe Drive. Click here for a map of affected area.

Details:

Water Division will be shutting the water off to replace a fire hydrant. A water boil order will begin when the water service is restored. All water used for consumption must be boiled for at least five minutes prior to use. All effected customers have been notified by door tags. After the water service has been restored the samples will be collected for analysis.

Customers will be under this precautionary boil order for approximately 48 hours. Once the lab has verified clear water samples, the customers will be notified with another door notice.


Project: Pavement Rejuvenation

Dates: Beginning Sept. 22-25, 2020

Location: 14 locations across town. Click here for a map of affected area.

Details:

The St. Charles Public Works Department will be applying pavement rejuvenation liquids to streets at 14 locations across the City, weather permitting. The roads will remain open during the process.

The rejuvenation process involves applying asphalt sealing liquid to the street that helps keep water from penetrating the asphalt. Less water infiltration means less freeze/thaw damage to the pavement, preventing future cracks and potholes.

After the sealant is applied, sand will be spread over the road surfaces for traction, and the excess will be swept up within a day or two.

For more information, visit the City website at www.stcharlesil.gov/projects/2020-street-rejuvenation-program or contact Public Works Manager – Engineering Ken Jay at 630.377.4418 or kjay@stcharlesil.gov

 

updated Sep 25, 2020