Anticipated construction work for the week of June 20 – June 27:

Please Note: All work contingent on weather

Milling and resurfacing work are currently on hold due to the Operator Union Local 150’s strike reducing stone material availability. Work will resume as soon as a resolution is reached.

• East Side Streets:
o Illinois Ave. 3rd to 10th – No work

o Illinois Ave. 38th to Kautz – No work

o Cumberland Green – No work

o Cumberland Pkwy. – No work

o N. 2nd Ave. – Potential for utility replacement

o N. 3rd Ave. – Potential for utility replacement

• West Side Streets:
o S. 2nd St. – No work

o N. 4th St./Mark St. – Utility preparation work. Shutdowns are scheduled for the week of 6/27. Residents will be notified with a door hanger if they will be impacted by shutdowns.

o S. 7th St. – Utility work. Site cleanup

o S. 14th St. – Cleanup and landscape restoration

o S. 15th Ct. – Cleanup and landscape restoration

o McKinley St. – Cleanup and landscape restoration

o Pleasant Plains – Cleanup and landscape restoration

o Tower Hill Dr. – Cleanup and landscape restoration

o Millington Way – Cleanup and landscape restoration

o Matisse Dr. – Cleanup and landscape restoration

o Picasso Dr – Cleanup and landscape restoration

o Monet Pl. – Cleanup and landscape restoration

updated Jun 17, 2022