You are here

Update 7/8/22

Please Note: All work contingent on weather

Milling and resurfacing work are currently on hold due to the Operator Union Local 150’s strike reducing stone material availability. Work will resume as soon as a resolution is reached.

• East Side Streets
o Illinois Ave. 3rd to 10th – Utility work to begin.

o Illinois Ave. 38th to Kautz – No work anticipated.

o Cumberland Green – No work anticipated.

o Cumberland Pkwy. – No work anticipated.

o N. 2nd Ave. – Concrete curb and gutter and sidewalk removal and replacement

o N. 3rd Ave. – Concrete curb and gutter and sidewalk removal and replacement

• West Side Streets
o S. 2nd St. – Water service removal and replacement from main into the parkway. Street will be closed to through traffic, local traffic will still have access.
Concrete curb and gutter and sidewalk removal and replacement

o N. 4th St./Mark St. – Concrete curb and gutter and sidewalk removal and replacement

o S. 7th St. – Pavement removal, new curb and gutter placement

o S. 14th St. – No work anticipated.

o S. 15th Ct. – Minor concrete work

o McKinley St. – No work anticipated.

o Pleasant Plains – Minor concrete work

o Tower Hill Dr. – No work anticipated.

o Millington Way – Minor concrete work

o Matisse Dr. – Minor concrete work

o Picasso Dr – Minor concrete work

o Monet Pl. – Minor concrete work

updated Jul 08, 2022