2020 Street Rejuvenation Program

The City will be “rejuvenating” 12 streets located across the city in September/October of 2020.  See project details below.

Project Phase: Construction

Proposed Improvements: The rejuvenation process involves applying asphalt sealing liquid that helps keep water from penetrating the asphalt. Less water means less freeze/thaw damage, preventing future cracks and potholes. After the sealing is performed, sand will be applied to the road surfaces for traction, and the excess will be swept up within one to two days.

Contractor:  Corrective Asphalt Materials

Construction Engineer:  Chris Gottlieb, P.E., Civil Engineer II

       Phone number 630-377-4405
       email cgottlieb@stcharlesil.gov

Estimated Timeline:  9/21 - 9/25/2020

Project Locations:  See attached location map for the locations of projects.

Road Closures:  Short-term lane closures will be required at intermittent times. 