2022 Street Rehabilitation Project

The City will be undertaking street resurfacing projects at various locations throughout the community, aimed at maintaining the current roadway infrastructure. 

See project details below and please check back for project updates as we progress through construction.

  • Project Phase: Pre - Construction
  • Proposed Improvements: This work generally includes repairs to the existing curbs, sidewalks, utilities, and providing a new asphalt roadway surface. 
  • Contractor:  Geneva Construction Company
  • Construction Engineer:  Chris Gottlieb, P.E., Civil Engineer II
                                               
     Phone number 630-377-4405
                                               
     email cgottlieb@stcharlesil.gov
  • Estimated Timeline:  Anticipated May 2022 – September 2022
  • Project Locations:  See attached location map for the locations of projects.
  • Road Closures:  Short-term road closures may be required at intermittent times.  No long term road closures are anticipated.

Update 6/17/22

Anticipated construction work for the week of June 20 – June 27:

Please Note: All work contingent on weather

Milling and resurfacing work are currently on hold due to the Operator Union Local 150’s strike reducing stone material availability. Work will resume as soon as a resolution is reached.

• East Side Streets:
o Illinois Ave. 3rd to 10th – No work

o Illinois Ave. 38th to Kautz – No work

o Cumberland Green – No work

o Cumberland Pkwy. – No work

o N. 2nd Ave. – Potential for utility replacement

5/27/22 Update

Anticipated construction work for the week of May 30 – June 3

Please Note: All work contingent on weather
No work will take place on the Memorial Day holiday

• East Side Streets
o Illinois Ave. 3rd to 10th – No work

o Illinois Ave. 38th to Kautz – No work

o Cumberland Green – No work

o Cumberland Pkwy. – No work

o N. 2nd Ave. – No work

o N. 3rd Ave. – No work

• West Side Streets
o S. 2nd St. – Utility work including scheduled water shutdown

o N. 4th St./Mark St. – No work

Pages

Active Project

Public Contacts