Kautz Road Widening and Reconstruction Project

The City, partnered with the City of Geneva, has received Surface Transportation Program grant funding in the amount of $2.5 million toward the widening and reconstruction of Kautz Road, from Commerce Drive in St. Charles to Longest Drive in Geneva.

  • Project Phase: Preliminary Design Engineering
     
  • Proposed Improvements: Using a combination of open trench and trenchless construction methods, the City will be installing new water main, storm sewer, and sanitary sewer including new water and sanitary service connections to each house. The City will then perform a full depth reconstruction of both streets with new stone base, asphalt surfacing, and concrete ribbon curb.
     
  • Lead Design Engineering Firm:  TranSystems Corporation of Schaumburg, IL
     
  • Estimated Timeline:  Preliminary Design phase to be complete in 2020.  Final engineering design is anticipated to begin in 2020, with completion in early 2022.  Construction is anticipated to be in 2022.
Active Project

Public Contacts