The City will be undertaking base reclamation at Production Drive. This project is aimed to improve the current roadway conditions that are fundamental for this business corridor. See project details below and please check back for project updates as we progress through construction.
  •  Project Phase: Pre - Construction
  • Proposed Improvements: This work consists of hot- mix asphalt pavement removal and resurfacing and base stabilization with cement. Removal and replacement of curbs and gutters, commercial driveways, and sidewalks is also included. Adjustments will be made to utility and drainage structures. Restoration is also included.
  • Contractor:  J.A. Johnson Paving Co.
  • Construction Engineer:  Chris Gottlieb, Civil Engineer II
                                             Phone number 630-377-4405
                                             Email cgottlieb@stcharlesil.gov
  • Estimated Timeline:  Anticipated July 2021 – August 2021
  • Project Locations:  See attached location map for the locations of projects 
  • Road Closures:  Short-term road closures may be required at intermittent times.  No long term road closures are anticipated.