Rte. 31 & Roosevelt St. Trunk Sewer Main Replacement Project

PROJECT PHASE:

Construction

PROJECT IMPROVEMENTS:

The City of St. Charles is conducting a sewer and water main replacement project in your neighborhood. Currently the existing infrastructure is in poor condition and frequent breaks cause service outages for local residents. This project will replace and upsize approximately 1,550 liner feet of sanitary sewer and water main along Rte. 31 between Mosedale and Roosevelt Streets. In addition, the project is proposing to replace an additional 2,200 liner feet of sewer main along Roosevelt Street between IL Rte. 31 and Elm Street.  

CONTRACTOR AND INSPECTOR:

The contract for this work has been awarded to Martam Construction, Inc. of Elgin, IL.   Tim Wilson, Public Works Manager – Environmental Service, will be the Project Manager for the City of St. Charles.  The City has hired Engineering Enterprises to be the on-site resident engineer to complete construction inspections for the work and to be your personal construction liaison.  Public Works will be the primary contact regarding any construction activity.  We can be reached at 630-377-4405 or by email at publicworks@stcharlesil.gov.  

START DATES AND COMPLETION DATES:

Expect to see JULIE locates, with construction equipment and staging within the City's easements in middle of April. The majority of the Rte. 31 construction will be completed during the summer. The Roosevelt Street completion will be dependent on the fall weather conditions. The goal is to complete the majority of the Roosevelt Street construction by this November with some landscaping and restoration to be completed in the Spring of 2022.

TRAFFIC IMPACTS:

Construction will start at the intersection of Rte. 31 and Mosedale Street in the early part of May. Rte. 31 will remain open to traffic for the majority of construction, but expect delays due to daily lane closures. At times driveway access will be unavailable during utility repairs, curb and driveway apron replacement.  Notification will be provided in advance of closures.

WATER IMPACTS:

The City will be coordinating scheduled water shutoffs as part of this project with the impacted customers. This will include a door notification of the expected shut down time and date. The City will make every effort to schedule all water main shutdowns; however, the contractor is replacing a deteoriating water main.  As a result, unexpected water main breaks can occur, resulting in an emergency water main shutdown.

MORE INFORMATION:

For more information on this project, please feel free to contact the Public Works Environmental Services Group at 630-377-4405.

Update - 8/16/21

Contractor will be installing sanitary sewer at the intersection of Roosevelt St. and Elm St. Due to the nature of the work, the intersection of Roosevelt and Elm will be closed on Monday and Tuesday. Additionally, new sanitary sewer services will be constructed throughout the week for the following lots:

Update - 8/9/21

The Contractor will continue west with the sanitary sewer next week. A
map of the approximate work zone is attached. Construction is a moving
operation; therefore, the work zones will change daily.

On-street parking will be prohibited in the work zone. Residents with
driveways within the active work zones are asked to relocate their car(s) to
an available location on Roosevelt Street or to a side street by 7 AM.

Update - 7/31/21

The Contractor will continue west with the sanitary sewer and water main.
A map of the approximate work zone of each operation is attached.
Construction is a moving operation; therefore, the work zones will change
daily.

Roosevelt Street will be reduced to one lane adjacent to active
construction. Flaggers will be present to control and direct traffic as
needed. On-street parking will be prohibited in the work zone. Residents
with driveways within the active work zones are asked to relocate their

Update - 7/23/21

The Contractor will continue west with the sanitary sewer and water main.
A map of the approximate work zone of each operation is attached.
Construction is a moving operation; therefore, the work zones will change daily.

Horne Street will be closed between Pine Street and Route 31 Monday
July 26th through Wednesday July 28th.
Driveways to residences on
Horne Street between Pine Street and Route 31 will remain accessible.

Update - July 16, 2021

The Contractor will continue west with the sanitary sewer.  Additionally, water main construction will start the week of July 19th.  A map of the approximate work zone of each operation is attached.  Construction is a moving operation; therefore, the work zones will change daily. 

Update - 6/30/21

Starting the week of July 6th, construction will start on Roosevelt Street.  The Contractor will be milling off portions of the pavement in anticipation of the utilities being installed. 

Milling operations will occur on Tuesday July 6th and are anticipated to last one day. After milling is completed, the sewer and water main installation will continue up Roosevelt Street starting at Rte. 31.