Construction

Update - 9/10/21

Next week the Contractor will be installing a small section of water main and water services from Fox Glade Court to 15 Roosevelt. Prior to your new water service being connected to your old water service an on-site field representative from the City or the contractor will be knocking on your door to let you know your service is about to be transferred over and your water will be temporarily turned off for 5 to 10 minutes.

Update - 9/9/21

Anticipated work for the week of 9/13/21 

Pour reminder of concrete sidewalk 

Pour concrete toe walls on box culvert end sections

Final grading and restoration of area north of Indiana

Pave binder and surface on Illinois Avenue

Pave surface on Indiana and Walnut Avenue 

Pave bike path

Install fencing 

Update - 9/3/21

Next week the Contractor will be installing sanitary sewer services and water services from east of Fox Glade Court to 15 Roosevelt. During sewer service installation, residents at these addresses can maintain normal water use. For the installation of the water services, residents will receive a separate notice informing them when their temporary water loss will occur.

Additionally, water main improvements will occur at the intersection of Fox Glade Court and Roosevelt Street on Tuesday.

No construction work will occur on Monday September 6th.

Update - 9/2/21

The intersection of Roosevelt and Elm will be closed for a few hours on Thursday morning. Please plan your travel route accordingly.

If you have any questions, please call Todd Wells with Engineering Enterprises, Inc. at 773-454-4214 or City Department of Public Works at 630-377-4405.

Update - 8/27/21

Next week the Contractor will be installing sanitary sewer, storm sewer and water
main at the locations noted on the map. Additionally, new sanitary sewer
services will be constructed throughout the week for the following lots:


• 21 Roosevelt
• 25 Roosevelt
• 27 Roosevelt
• 29 Roosevelt
• 31 Roosevelt
• 33 Roosevelt
• 65 Roosevelt
• 83 Roosevelt


Residents at these addresses can maintain normal water use.

The intersection of Roosevelt and Elm will be closed Monday afternoon.

Update - 8/27/21

Anticipated work for the week of 8/30 

* Please note - all work is weather dependent 

Grading and place stone for bicycle path and sidewalk north of Illinois 

Set the pedestrian bridge at the north project limit and pour the concrete deck and approaches

Pour curb and gutter on Illinois Avenue 

Final grading and top soil placement

Update - 8/20/21

Next week the Contractor will be installing sanitary sewer and water main at the locations noted on the map.  Additionally, new sanitary sewer services will be constructed throughout the week for the following lots: 

  • 21 Roosevelt
  • 25 Roosevelt
  • 27 Roosevelt
  • 29 Roosevelt
  • 31 Roosevelt
  • 33 Roosevelt
  • 57 Roosevelt
  • 61 Roosevelt

Residents at these addresses can maintain normal water use. 

Update - 8/19/21

Anticipated work for week of 8/23 

Please note:  All work is weather dependent

Permanent restoration with seed and blanets along the creek banks 

Continue stone armoring along the creek banks 

Grading and place stone for bicycle path north of Illinois 

Framing and pouring concrete foundations for the pedestrian bridge at the north project limit 

Structure adjustments in the street on Indiana Avenue and Walnut Avenue 

Update - 8/16/21

Next week the Contractor will be installing sanitary sewer at the intersection of
Roosevelt St. and Elm St. Due to the nature of the work, the intersection of
Roosevelt and Elm will be closed on Monday and Tuesday. Additionally, new
sanitary sewer services will be constructed throughout the week for the following lots:

• 20 Roosevelt
• 24 Roosevelt
• 28 Roosevelt
• 30 Roosevelt
• 32 Roosevelt
• 34 Roosevelt
• 36 Roosevelt
• 38 Roosevelt
• 45 Roosevelt
• 57 Roosevelt
• 61 Roosevelt