Seventh Street Commons
Seventh Street Commons PUD is scheduled to be considered by the City Council on November 2, 2026.
Updated documents submitted for the City Council meeting are posted in the Project Documents menu and the Agenda packet.
Frequently Asked Questions about the Project
Below is a list of responses to questions received by the City following the 10/19 Committee of the Whole meeting:
Property Ownership
The property is owned by WM St Charles, LLC. Since 2006, the property has been owned by different entities affiliated with the ownership of past developer, Lexington Homes.
The property is under contract to be acquired by Pulte Home Company, LLC.
WM St Charles, LLC provided an Owner Authorization letter consenting to Pulte Home Company, LLC submitting zoning applications for the property.
Pulte submitted complete zoning applications to the City in June 2026.
Environmental Remediation
The City shares residents' desire for a safe and thorough remediation process. The property is a former industrial site and any redevelopment will require remediation consistent with Illinois Environmental Protection Agency (IEPA) requirements for residential land use. While the City is not the regulatory authority overseeing cleanup activities, approval of a redevelopment project by the City creates a pathway for remediation that would otherwise not occur on a vacant private property.
Historically, the property had been utilized by various industrial manufacturing businesses since the early 1900s.
In 2025, the City contracted with AE3 Engineering to conduct a Phase 1 environmental assessment(PDF, 105MB). This report was prepared for the City in cooperation with the property owner. The report was to be utilized to seek grant funding for environmental remediation. AE3 did not complete a Phase 2 or any subsequent report for the City.
The project developer, Pulte, has engaged an environmental consultant, BBJ, to complete environmental reports on their behalf.
To initiate the process to remediate the site, Pulte will re-enroll the property in the IEPA Site Remediation Program. The program requires an applicant to submit environmental analysis of the property along with a proposed Remediation Plan for review and approval. The plan will identify the methods to remove materials and remediate the property to a standard for residential land use per the EPA guidelines. At the conclusion of the remediation process, the IEPA will issue a “No Further Remediation” letter, or NFR, certifying that the property is suitable to residential development, subject to any conditions specified in the NFR approval letter.
Pulte has provided an Overview of the Proposed Site Cleanup(PDF, 527KB) prepared by BBJ Group.
Traffic Study
A traffic study(PDF, 14MB) was conducted by KLOA and submitted by the developer, Pulte. The traffic study was reviewed by the City’s traffic engineering consultant, Clark-Dietz. The consultant reviewed the study in detail and recommended revisions, which have been incorporated into the final study. The review consultant agrees with the traffic study findings and recommendations.
To model conditions for a traffic study, new traffic expected to be generated by the development is estimated based on data from the Institute of Transportation Engineers (ITE). The ITE data is an industry standard data source based on averages from actual studies of traffic generated by development projects. This data for “new” traffic is combined with existing traffic counts, plus expected background traffic growth, to model the function of the street network during peak times when the traffic volume is projected to be highest.
The results showed that the existing transportation network can accommodate new traffic generated from the development, with new vehicle trips expected to be distributed across four different public street connections to the site. These four access points provide routes to exit the neighborhood and reach arterial streets in multiple directions.
The traffic study showed minimal impact to the function of the nearby intersections along State and Dean St. Therefore, no traffic control changes are recommended based on the study findings. As the project is built out and traffic patterns change in the neighborhood, the City can monitor conditions at each intersection to determine if traffic meets an engineering standard for additional traffic control, such as the installation of a 4-way stop sign.
The study showed added delays at the 7th and Main Street traffic signal, particularly the northbound approach. A recommendation was provided to reoptimize the traffic signal to add green time to the north and south approach. This requires evaluation and approval by the Illinois Department of Transportation.
There are no plans to restrict any on-street parking.
Sidewalks and Paths
The project includes complete sidewalks within the development, on both sides of the streets. Off-site sidewalks will be added to complete connections to existing sidewalk networks along 6th and 7th Streets, completing a connection to the 7th & Main signalized intersection. Sidewalks will extend from the site along 9th Street to Belgium Town Park and connect with an east-west trail following the north side of State Street Creek. The trail along the creek will run from 12th Street, to Belgium Town Park, and continues across 9th street to 7th and 6th Streets. A trail section is also provided to the north for a connection to the former railroad right-of-way, to connect to a possible future regional trail.
The sidewalk and pedestrian improvements within the project are consistent with the recommendations of the City’s 2023 Bike and Pedestrian Plan. Note that the Bike and Pedestrian plan identifies a number of potential improvements within the area along State and Dean Streets- these are projects that involve neighborhood-wide improvements that would need to be designed and implemented by the City.
Construction Access
A construction access route will be designated for the heavy construction traffic associated with building demolition and grading of the property. Typically, the designated construction route is the shortest route from a nearby arterial street. The most direct route to the site is 9th Street from Main St./Rt 64. For the previous development project approved for this site, 9th Street was the approved construction route.
During the demolition and site work phase of the project development, City inspectors will monitor the condition of City streets during construction and document any damage. The City maintains a financial guarantee and insurance coverage from developers to cover the expense of damage to public infrastructure during construction.
Tree Preservation and Landscaping
The project landscape plan shows trees from an earlier tree survey and identifies those trees planned to be preserved.
Trees internal to the site will need to be removed during the site demolition and environmental remediation. These areas include extensive building foundations, pavement, and areas of fill materials. Other areas of the site will be graded to level the property for development and installation of stormwater detention basins.
Areas of trees to be preserved are located south of the State Street Creek. This includes an open area there that will not be developed along the east side of 9th Street.
The landscape plans identify installation of 148 trees parkway trees along the public streets within the project site and 153 trees around the stormwater basins and open space parcels.
For more details, see the updated Tree Preservation and Landscape Plan(PDF, 24MB)
Funding for City Relocation of Electrical Lines
Currently, there are overhead public electrical distribution lines that cross through the project site. These lines are in conflict with development of the site and must be relocated.
The City will complete this work prior to Pulte starting the development of the property. The cost is estimated at less than $3 million.
The City is in the process of establishing a Tax Increment Financing (TIF) district to provide for reimbursement of the electric relocation cost.
Through a TIF district, the City will be reimbursed from the new property taxes paid by residents of the new development. The new property taxes are expected to pay off the City electric relocation costs within 4 to 5 years.
The TIF district will not provide any reimbursement to Pulte. All other site development costs will be paid by Pulte as the developer, including demolition, environmental remediation, site grading and installation of public infrastructure including roads, sidewalks and utilities.
For more information on the proposed Seventh Street Commons TIF District, see the Background and Summary document(PDF, 367KB).
Background and Review Process
Project Site History
The subject property is a 27-acre former industrial site. The Applied Composites Company ceased operations on the site in 2005. The former industrial buildings are mostly demolished.
After the closing of the industrial facility, the City initiated a public review process to update the long-range Comprehensive Plan for the property. In 2008, the City adopted a Comprehensive Plan amendment to change the site to residential land use, to be an extension of the neighborhood to the south, with an interconnected street network.
In 2013, the City approved rezoning of the property from industrial to residential use and approved the Lexington Club project. The Lexington Club project included 102 townhomes and 28 single family homes. The Lexington Club project was never constructed.
The property has remained vacant and zoned for residential use.
Concept Plan review - Completed in May 2026
In Spring 2026, Pulte Home Company, LLC submitted a Concept Plan proposing a residential development called “Ninth Street Commons”, consisting of 105-units (93 single-family homes and 12 townhomes).
The Concept Plan was discussed by the Plan Commission on April 21, 2026 followed by the Committee of the City Council on May 4, 2026. Meeting minutes and information from the Concept Plan review can be viewed on the meeting pages.
The Concept Plan review process enables developers to obtain informal feedback from City officials and the public before spending time and money to prepare detailed plans. The conclusion of the Concept Plan review is not a decision by the City, but simply information that the developer can use to decide whether to pursue the project further.
Development Applications - submitted in June 2026
Pulte Home Company, LLC submitted formal applications to the City for the project, now known as “Seventh Street Commons”. The Applications include:
- Zoning Map Amendment, to adjust the boundaries of the existing residential townhome and single-family zoning areas within the site
- Special Use for Planned Unit Development, to establish zoning standards for the project
- PUD Preliminary Plans, showing preliminary engineering, landscaping and building architecture for the project, for review and approval
The project is similar to the Concept Plan presented previously, with the same number of units (93 single-family homes and 12 townhomes). Development applications and preliminary plans can be viewed on the Project Documents menu.
Public Meetings
Plan Commission Public Hearing and Recommendation
Plan Commission held a public hearing on September 22, 2026. Information from the public hearing, including the meeting materials, minutes and video, can be viewed on the Meeting page.
Ten members of the public spoke at the public hearing or provided written comment. Comments centered around concerns for change to neighborhood character, impact on property values and taxes, removal of trees, and traffic impacts.
Plan Commission recommended approval by a vote of 7-0, subject to the following conditions:
- Remove invasive species south of State Street Creek
- Add 60 trees in the detention basins and along the pedestrian path
- Provide additional space between the path connecting to the park on Outlot E and the adjacent industrial property
- Create consistent parkway along Lots 18-21 to allow for parkway tree planting
- Provide upper windows in all garage doors
- Provide windows or French doors for all front entry doors
- Separate the townhome driveways
- Allow a 6’ privacy fence along the rear lot lines of Lots 51-58 to screen from adjacent industrial property
- Add benches along the path system
Plans have been revised in response to the Plan Commission conditions.
City Council Committee of the Whole Review and Recommendation
The Committee of the Whole reviewed the project and Plan Commission recommendation on October 19, 2026. The Committee recommended approval by a vote of 7-1, subject to the following condition:
- 30 additional trees shall be added within the stormwater outlots along the south.
The developer has been asked to provide a revised Landscape Plan in response to the Committee's condition of approval.
The project is scheduled for City Council vote on November 2, 2026.
For more information, please contact the Community Development Department at cd@stcharlesil.gov or (630) 377-4443.