The work proposed for the week of July 11th includes:

  • Resurfacing Area (Division Street to Cambridge Drive) - No work anticipated.
  • Reconstruction Area (Cambridge Drive to Tyler Road)
    • Utility work and placement of the final layers of roadway stone will take place this week.  During this work the roadway will be closed to traffic between the hours of 7am to 7pm.  If you have a vehicle you would like to use during this time, please make sure to have it out of the project area by 7am.  It is planned to have a stone ramp to all driveways in place at the end of each work day.  If we run into any problems during the excavation work that would prohibit access at the end of the day to your property you will be notified.
    • Starting the week of July 18th through July 29th it is anticipated that the contractor will be placing the new curb, driveways and first layers of asphalt in this area.  During this two week period driveway access will not be available to residents in this area.  Residents may park their vehicles in front of their homes between the hours of 7pm to 7am.  During working hours of 7am to 7pm all vehicles must be moved outside of the work site and parked on the adjacent side streets.  Door tags with additional information regarding the driveway closures will be sent out 48 hours in advance of the closures of driveways. 

 

created Jul 08, 2016 updated Mar 23, 2018