You are here

Update - 8/3/23

Anticipated construction work for the week of Aug 6 – Aug 12

Please Note: All work contingent on weather

Pavement milling on Lexington/Liberty/Lancaster/Cranbrook and Hampton Course is scheduled to start the week of 8/14. Please check the website regularly for updates.

Any driveway aprons damaged by construction will be fully replaced by the City. For those residents on Lexington/Liberty/Lancaster/Cranbrook whose driveway was damaged on the private side of the sidewalk, the City will be repaving the full width of the driveway up to the furthest point of the damage. If you would like the remainder of your driveway repaved, Geneva Construction is offering to do the work billing residents at the City’s rate. Please reach out to Kurt Roth (kurtr@genevaconstruction.net) to coordinate.

East Side Streets

  • Fox Chase Blvd. – Asphalt surface
  • Hampton Course – Landscape restoration
  • Lexington Ave. – Concrete restoration, landscape restoration, driveway repairs
  • Lancaster Ave. – Concrete restoration, landscape restoration, driveway repairs
  • Liberty Ave. – Concrete restoration, landscape restoration, driveway repairs
  • Liberty Ct. – Concrete restoration, landscape restoration, driveway repairs
  • Cranbrook Ave. – Concrete restoration, landscape restoration, driveway repairs

West Side Streets

  • River View Dr. – Asphalt surface
  • River Ridge Dr. – Asphalt surface
  • Prairie Crossing Dr. – General cleanup
  • Renard Ln. – General cleanup
  • Voltaire Ln. – General cleanup
  • Provence Dr./Ct. – General cleanup
  • Antoine Pl./Ct. – General cleanup
created Aug 03, 2023 updated Aug 03, 2023

For more information