The work proposed for the week of July 18th includes:

Resurfacing Area (Division Street to Cambridge Drive) - No work anticipated.

Reconstruction Area (Cambridge Drive to Tyler Road) – The contractor will be placing the new curb and concrete driveway aprons.  The roadway in this area will continue to be closed to traffic. During this closure, all refuse collection will take place as usual. 