Anticipated construction work for the week of August 4 - August 14
Please note: All work contingent on weather
- East Side Streets
- Illinois Ave. 3rd to 10th – Utility work
- Illinois Ave. 38th to Kautz – No work
- Cumberland Green – Utility work including planned water main shutdowns. Residents will be notified with a door hanger if they will be impacted by shutdowns.
- Cumberland Pkwy. – No work
- N. 2nd Ave. – Asphalt level binder, utility adjustments, asphalt surface
- N. 3rd Ave. – Asphalt level binder, utility adjustments, asphalt surface
- West Side Streets
- S. 2nd St. – Landscape restoration, asphalt level binder, utility adjustments, asphalt surface
- N. 4th St./Mark St. – Asphalt level binder, utility adjustments, asphalt surface
- S. 7th St. – Asphalt level binder, utility adjustments, asphalt surface, striping
- S. 14th St. – Asphalt binder
- S. 15th Ct. – Asphalt binder
- McKinley St. – Asphalt level binder, utility adjustments, asphalt surface
- Pleasant Plains – Potential milling of asphalt surface
- Tower Hill Dr. – Potential milling of asphalt surface
- Millington Way – Milling asphalt surface
- Matisse Dr. – Potential milling of asphalt surface
- Picasso Dr – Potential milling of asphalt surface
- Monet Pl. – Potential milling of asphalt surface