Week of August 17, 2015

The work completed for the week ending August 15, 2015 included the connection at Marion Avenue.  The contractor televised a section of the watermain for investigation of debris and performed heavy cleaning of the watermain using a swabbing device.  Cleanup efforts on the project site continue.

The scheduled work for the week ending August 22, 2015 will include the re-televising of the watermain prior to flushing and pressure testing to assure that the line has been cleaned thoroughly. 

Week of August 17, 2015

West Side of Fox River

Avalon Court
No work this week.

8th Street and 8th Court
No work this week.

Greenwood Ln., Mockingbird Ct. and Oxmoor Ct.
No work this week.  

East Side of Fox River

Walnut Ave.
Hot Mix Asphalt pavement grinding.
Hot Mix Asphalt pavement paving.

Crabapple Ln.
No work this week.

S. 10th Ave
Hot Mix Asphalt pavement grinding.
Hot Mix Asphalt pavement paving.

Week of August 10, 2015

West Side of Fox River

Avalon Court
No work this week.

8th Street and 8th Court
No work this week.

Greenwood Ln., Mockingbird Ct. and Oxmoor Ct.
No work this week.

East Side of Fox River

Walnut Ave. 
Concrete pavement base. HMA pavement grinding. Brick sidewalk repair.

Crabapple Ln.
No work this week.

S. 10th Ave
Concrete sidewalk repair.

Week of August 3, 2015

The work completed for the week ending August 1, 2015 included starting on the Marion Avenue connection as well as the fire hydrant installation at this location.  Flushing and pressure testing of the new watermain has begun.  The contractor has begun restoration of curb and gutter.

Week of August 3, 2015

West Side of Fox River

Avalon Court
Paving complete, Restoration September 1st.

8th Street and 8th Court
Paving complete, Restoration September 1st.            

Greenwood Ln., Mockingbird Ct. and Oxmoor Ct.
Paving complete, Restoration September 1st.

East Side of Fox River

Walnut Ave.
No work this week.

Crabapple Ln.
Paving complete, Restoration September 1st.

Week of July 27, 2015

West Side of Fox River

Avalon Court
Hot Mix Asphalt, leveling binder and crack prevention material

8th Street and 8th Court
Hot Mix Asphalt, leveling binder and crack prevention material               

Greenwood Ln., Mockingbird Ct. and Oxmoor Ct.
Hot Mix Asphalt, surface and crack prevention material

East Side of Fox River

Walnut Ave.
Concrete street repair and patching